![The refurbishment of the VAB will include removing seven Apollo-era platforms from high bay 3 and replacing them with modern versions that can be relocated and reconfigured for multiple launch vehicles.](https://appel.nasa.gov/wp-content/uploads/2012/08/ApolloPlatforms-670x380.jpeg)
Refurbishing the VAB
Read More
By Jose Lopez The challenge is twofold. First, as with any aging structure, much of the piping, HVAC, fire-protection, electrical, communications, and other systems are outdated or beyond their intended lifespan.