10 Best Practices for Developing Reliable Project Schedules
Jason Lee, of the US Government Accountability Office (GAO), is interviewed by Ramien Pierre as part of NASA’s Virtual PM Challenge. Lee discusses the recently published GAO Schedule Assessment Guide. The guide captures 10 best practices for developing project schedules, and maps each practice to one of the four characteristics of a reliable schedule, specifically that it is: (1) comprehensive, (2) well-constructed, (3) credible, and (4) controlled. The rest of the interview with Lee is available at:
http://www.nasa.gov/offices/oce/pmchallenge/index.html