Back to Top

Subscribe to INSIGHT

Expanding perspectives every month.

Subscribe
The NASA Autonomous Flight Termination Unit. Credit: NASA
Spotlight on Lessons Learned: Static Software Analysis of the NASA Autonomous Flight Termination Software

A NASA Engineering and Safety Center assessment of the Autonomous Flight Termination System resulted in coding standard and software static analysis recommendations for software development teams.

Read More
A view of one of the large test structures located at the Launch Equipment Test Facility (LETF) on Oct. 19, 2020, at NASA’s Kennedy Space Center in Florida. The LETF is a unique set of structures, equipment and tools built to test full-scale umbilicals and release mechanisms for the space shuttle. Credit: NASA/Kim Shiflett
Critical Knowledge inSight: First-time Build Challenges are Inevitable

New technologies and their risks are difficult to characterize and provide important opportunities for lessons learned and process improvements.

Watch Video
The Orbiting Carbon Observatory, or OCO, was designed to make space-based observations of carbon dioxide in Earth's atmosphere to better understand the characteristics of climate change. This illustration shows the OCO-1 satellite in space, with Earth in the background. Credit: NASA
Spotlight on Lessons Learned: Orbiting Carbon Observatory Launch Vehicle Mishap Investigation Results

Failure of a launch vehicle payload fairing to separate during ascent resulted in the loss of the Orbiting Carbon Observatory satellite mission.

Read More
Screen shot of David Wilcox speaking during his interview. Credit: NASA
Critical Knowledge inSight: Best Practices for Managing Small Projects

Small projects have unique characteristics that should be closely observed to help achieve a successful outcome.

Watch Video
Graphic for Spotlight on Lessons Learned.
Spotlight on Lessons Learned: System / Facility Impedance Checks

Impedance compatibility problems between test facilities and electronics hardware can result in damage or failure.

Read More
This illustration shows a CubeSat scanning and mapping an asteroid. Credit: NASA
Spotlight on Lessons Learned: Open-Source and Commercial Web Software Vulnerabilities

Projects that use commercial web software should take proactive measures to mitigate IT security risks.

Read More
A group photo of people in white hard hats. Credit: NASA
Critical Knowledge inSight: Focus on People to Prevent Mistakes and Their Consequences

A program/project manager should spend time building relationships and interacting with their team in the work environment.

Watch Video
Here, Canadian Space Agency astronaut Chris Hadfield prepares to set up the ISERV in the Destiny module of the International Space Center. Credit: NASA
Spotlight on Lessons Learned: Program Management of ISERV Design, Development, and Qualification Class D Hardware Integration

Specific events and obstacles encountered during the design and development of the ISERV payload provide the basis of an applicable program management lesson learned.

Read More
Screenshot of Doug Hensch smiling during his interview. Credit: NASA
Critical Knowledge inSight: Building Resilience

A project manager can build resilience skills to perform better on the job.

Watch Video